The joint cabinet of Cambridge City and South Cambridgeshire recommended the Greater Cambridge Local Plan for submission to government on 17 November. In CB24, which includes Northstowe, new builds sold for a median 22 percent above existing homes in 2025 (99 new-build sales against 611).
Land Registry records for CB24 in calendar year 2025 put the new-build median at £475,000 on 99 new-build sales and the existing-home median at £390,000 on 611 existing-home sales. The plan would guide more than 50,000 new homes across Greater Cambridge between 2024 and 2045, and around 37,000 of those are already planned through existing permissions and allocations.
Cambridge City and South Cambridgeshire’s joint cabinet on 17 November recommended submitting the proposed Greater Cambridge Local Plan for government examination. Cambridge and South Cambridgeshire are among the areas the Government identifies as facing high affordability pressure, and council evidence points to an acute need for affordable housing.
The cabinet recommendation follows more than 22,000 comments across four consultation stages, including 2,863 representations in the final Regulation 19 round from 778 people and organisations.
The premium that flipped
In 2024, CB24 new builds sold below existing homes, with a new-build median of £375,630 on 170 new-build sales against £390,000 on 490 existing-home sales. By 2025 new builds had flipped to 22 percent above existing homes (99 new-build sales) on the same existing-home median.
Source: HM Land Registry Price Paid Data
Dearer in the city
Cambridge recorded a median of £475,000 on 1,106 sales from October 2025 to September 2026, with new builds accounting for 24 of those sales, or 2 percent.
South Cambridgeshire posted a median of £420,000 on 1,799 sales in the same 12 months to September 2026. New builds made up 59 sales, or 3 percent.
The East of England region, comprising Bedfordshire, Cambridgeshire, Essex, Hertfordshire, Norfolk and Suffolk, recorded a median of £340,000 on 70,397 sales in the 12 months to September 2026, with new builds at 2 percent (1,677 sales).
England sat further below Cambridge, at a median of £285,000 on 676,259 sales, with new builds at 2 percent (13,212 sales). Northstowe recorded £380,000 on 51 sales, Waterbeach £395,000 on 77 sales, and Great Cambourne £294,000 on 49 sales.
CB23 saw a median of £400,000 on 1,281 sales across 2024 and 2025, with new builds at 17 percent (215 sales). CB25 recorded £394,000 on 627 sales, with new builds at 11 percent (69 sales). CB24 across the same two years posted £392,750 on 1,370 sales, with new builds at 20 percent (269 sales).
Forty percent on major sites
If the plan is adopted, Policy H/AH would require at least 40 percent of homes on major housing developments to be affordable on site, unless an allocation policy sets a different rule, the site sits in the Green Belt, or co-living pays an off-site contribution.
Representations raised water capacity and bat habitats along East West Rail, and councillors said development may be paused if infrastructure is not in place.
Two votes, then examination
Cambridge City Council votes on submission on Thursday 26 November 2026, and South Cambridgeshire on Tuesday 8 December. If both agree, the councils aim to submit to government by the end of 2026, with an independent examination expected in the first half of 2027.
Until a new plan is adopted, the 2018 local plans still govern planning decisions in Cambridge and South Cambridgeshire.
